PRODUCTION TEST OPERATING MANUAL

Client: AGIP
Project: “Silvia 1” Oil field

SILVIA 1 Oil Field

Production test operating manual which contains the detailed procedures studied in relation with Agip “Silvia 1” oil field production tests mainly consisting of guidelines for safe and effective mooring and un-mooring of tankers to Atwood Southern Cross semi-sub platform procedure for handling and connection of the floating manifold to the tanker and the platform definition of the production test procedure and description of the systems involved with special care to the related possible safety issues for the crew of the units and pollution risks.