Author: admip

SUPERVISION DURING CONSTRUCTION OF A RO-RO CARGO

SUPERVISION DURING CONSTRUCTION OF A RO-RO CARGO

Client: Giovanni Visentini Trasporti Fluviomarittimi Srl
Project: Ro _ Ro Cargo – New building

Supervision during construction of Ro-ro cargo

Supervision during the construction of one ro-ro cargo at AVIC Shipyard Weihai – China after a phase of pre-contractual technical assistance, preparation of the technical specification and drawings approval.

SUPERVISION DURING CONSTRUCTION OF VARIOUS TUG BOATS

SUPERVISION DURING CONSTRUCTION OF VARIOUS TUG BOATS

Client: Various Owners
Project: Tug boats – New buildings

Supervision during consruction of Tugs

Supervision during construction of tugs:

  • four Voith Schneider tugs at UNV Shipyard Valencia – Spain
  • one Azimuthal Stern Drive tug at UNV Shipyard Valencia – Spain
  • one twin screw tug at Damen Shipyard Galati – Romania

For the above projects we supported Owners also with pre-contractual technical assistance, preparation of the technical specification and drawings approval.

ANALYSIS OF THE ENVIRONMENTAL LOGISTIC CONTEXT OF A NEW SINGLE POINT MOORING OFFSHORE GENOVA HARBOUR

ANALYSIS OF THE ENVIRONMENTAL LOGISTIC CONTEXT OF A NEW SINGLE POINT MOORING OFFSHORE GENOVA HARBOUR

Client: Porto Petroli di Genova SPA
Project: Single point mooring

Analysis of the environmental logistic context of a new single point mooring offshore Genova harbour

The study carried out was aimed to define the main characteristics, operational and environmental conditions to be taken into account in the design of a new single point mooring for oil discharge offshore Genoa harbour.
The possible position of the new plant has been also evaluated taking into account the multiple interactions between the shore terminal, the contiguous Fincantieri shipyard and the residential area which are located very close to the shore discharging area.
A risk analysis related with the intended operations has been also carried out.

PORT FOUAD GAS FIELD – EXPLORATION OF NEW AREA

PORT FOUAD GAS FIELD – EXPLORATION OF NEW AREA

Client: IEOC Production BV
Project: Port Fouad – Exploration of new area

Port Fouad Gas Field - Exploration of new area

The scope of work was to develop a proposal to Suez Canal Authorities for the identification and safety measures to be adopted to mark off the offshore Port Fouad field, located in the Suez Canal approach area where drilling rigs or jack-up would be intended to be located for the development of a gas-field.

ANALYSIS OF FSO “VEGA OIL” SUBSTITUTION PROPOSAL

ANALYSIS OF FSO “VEGA OIL” SUBSTITUTION PROPOSAL

Client: ENI / LOGIS
Project: Substitution of FSO “VEGA OIL”

Analysis of FSO VEGA OIL substitution proposal

Interprogetti  has been requested by the Client to analyze and comment Edison’s proposal of purchase and conversion of m/t “Shetland Spirit” to substitute FSO “Vega Oil” with special attention to the following aspects:

  • Technical/economical proposal for m/t “Shetland Spirit” purchase
  • Technical/economical proposal for the conversion into FSO
  • Proposal for upgrading of the Single Point Mooring
  • Time/costs estimation for disconnection, towage and cleaning of FSO “Vega Oil”
LOAD OUT OF PROPANE PIPE RACK

LOAD OUT OF PROPANE PIPE RACK

Client: Fagioli
Project: Bechtel / Curtis LNG project

Load out of propane pipe rack

The purpose of the job was to assist as ballast engineer during the load-out of the “Propane Pipe Rack” onboard a barge, carried out at Laem Chabang – Thailand by means of self propelled modular transporters.

MARINE WARRANTY SURVEYS

MARINE WARRANTY SURVEYS

Client: STL/SINOPEC
Project: Several modules shipment

Marine Warranty Surveys

Supervision during transhipment of modules up to 315 t from heavy lift vessels to flat top barges. The purpose of the job was to ensure safe lifting and proper sea-fastening for transportation from Black Sea to Kazakhstan.